Custom QFN · one-shot development · production lots
Custom QFN, from first build to production.
Custom QFN packaging for your die, from first build to production lots. We design and simulate the package substrate, have it built in panel format, then die attach, wire bond, seal, laser mark and saw your units, with inspection at every step. Choose encapsulated, air cavity or overmolded. Most of the development is done before the first build, so programs usually take fewer iterations. Already have a working QFN? Our automated die bond and wire bond lines have open capacity for production lots.
/ Substrate design / Digital twin before build / Encapsulated, air cavity, overmolded / Laser marked / NDA on request

Typical capability
Sizes, quantities, constructions.
These are typical, not limits. Outside them? Send the data and ask.
Sized to your die
Body size, lead count, pitch and exposed pad set by your pin-out, or by a body we propose.
First build to production
From a first build for evaluation to production lots.
Gold or aluminum, 15–50 µm
Gold ball bond or aluminum wedge, matched to the pad and the current.
Encapsulated, air cavity or overmolded
Encapsulated or air cavity with a lid. Overmolded through a local partner, as part of the same program.
Quoted per program
Set mainly by substrate fabrication and the construction. Simulation and process set-up run while material is on order.
The one-shot program
Most of the development, done before the first build.
Custom packages often take more than one build to get right. Each extra build costs a substrate run, die you may not have spares of, and weeks.
On most programs, most of the development is done before the first build. The package design, the simulation and the assembly process are worked out together. The first build starts close to its final settings. Every step of that build is imaged and measured, and the details are tuned during the build. Each later program starts closer than the last.
The result is usually fewer iterations, lower development cost and less time to production. Some programs are harder and need more than one build. When that is likely, the plan says so.
What happens
- 01A digital twin of the assembly: a full 3D model of your assembled part, so fit and wire paths are checked before anything is ordered.
- 02Electrical simulation against your limits.
- 03Thermal simulation of the heat path.
- 04Every die pad traced to a lead, and the substrate checked by automated design-rule checking against the fabricator's own rule deck.
- 05Your review of the model and the results, then release to fab on your approval.
- 06A first build that starts close to its final settings. Every step is imaged and measured, and the details are tuned during the build.
- 07Each later program starts closer than the last.
Usually fewer iterations.
More problems are found at the design review, before a lot is built.
Lower development cost.
Fewer builds means fewer substrate runs and fewer die spent.
Less time to production.
Fewer builds between the design review and production lots.
Design is AI-assisted, with an engineer in the loop. Full design rules are available under NDA. This is how most programs run, not a guarantee of results on any one build.
Substrate and interposer design capability: design & firmware
Production
Production lots, with open capacity now.
Not every QFN program starts with a new die. If your package already works and you need lots, our automated die bond and wire bond lines have open capacity now. Inspection and records are set per program. Send the package drawing and the volume, and we quote the lots.
01 / Design
We design the substrate around your die.
We design the package substrate, from your pin-out or one we propose. We design the package.
- 01Pad-to-lead map and bond plan
- 02Body, lead pitch and exposed-pad size
- 03Stackup and materials
- 04Design-rule check against the fabricator's rule deck
- 05Digital twin (full 3D model), electrical and thermal simulation
- 06Design review, one revision, release
Wire-bond design rules behind the bond plan: wire bond
02 / Substrate fab
Built in panel format, by a vendor we select.
The laminate substrate is fabricated in panel format by a vendor we select for each job, chosen against the stackup and the schedule. We handle the tooling and the panel design: pin-1 mark, fiducials and saw lanes. One team owns the design, the vendor and the build.
Substrate materials: materials
03 / The first build
The first build starts close to final.
Recipes, fixtures and the traveler are set up for your package. The first build starts close to its final settings. Every step is imaged and measured, and the details are tuned during the build. You get a first-article report with the first lot.
- 01Recipes, fixtures and traveler
- 02First build near final settings
- 03Every step imaged and measured
- 04Details tuned during the build
- 05First-article report and control plan
Process development: engineering & AI
04 / Assembly
Wafer or die in. Marked QFN out.
Assembly runs at panel level, so every unit on a panel sees the same process.
- 01Die attach, placement to ±2.5 µm at 3σ
- 02Gold or aluminum wire bond
- 03Seal: encapsulated, air cavity with a lid, or overmolded
- 04Laser mark
- 05Saw to size
- 06Pick into waffle packs or trays
Encapsulated.
Sealed at panel level, then laser marked and sawn to size.
Air cavity.
An open-cavity body with a lid, for MEMS, sensors and RF die that can't be encapsulated.
Overmolded.
Offered as part of our program through a local molding partner.
die bonding · wire bond · laser marking · advanced sensors packaging
05 / Inspection and test
Inspected at every step. Test to your application.
Inspection is built into the flow, and test is defined per program. It can be your own ATE or electrical test we set up with you.
- 01Incoming inspection of die and panels
- 02AQL-sampled visual after die attach, wire bond and saw
- 03Die shear and wire pull samples on every lot, wire pull to MIL-STD-883 Method 2011
- 04X-ray where your program needs it
- 05Outgoing inspection and dimensions
- 06Records by lot, shipped with the units
06 / Ship and scale
From first lot to production lots.
When a program is ready to scale, lots move to production on the same design and the same records. Qualification and electrical test validation are planned as their own phase, against your field-life target.
Need flip chip instead of wire bond? See custom ASIC FCBGA.
Deliverables
Design to shipped parts.
Design (before fab)
- 01Digital twin review: full 3D model of your assembled part
- 02Electrical and thermal simulation results
- 03Package outline drawing, PDF + STEP
- 04Substrate fab drawing and stackup
- 05Pad-to-lead map and bond diagram
- 06Design-rule check report
Build (with the units)
- 07First-article report
- 08Traveler and inspection records by lot
- 09Die shear and wire pull data
- 10Marked units in waffle packs or trays
- 11Certificate of conformance
How we price it
Set up once. Later die usually cost less.
Set-up, once
Panel format, tooling and process set-up for your package family, done one time.
Per die type
Substrate design and process bring-up for each new die.
Per lot
The build. Repeat lots carry no new design work.
How quoting works
- 01Engineering (NRE) priced separately from the unit price
- 02A budgetary price first, from what you can share today
- 03A firm price once the data package is in
- 04Expedite available
- 05One PO, invoiced by phase
To quote it
What to send us.
Send what you have today. We price from it, and firm the price once the rest is in. NDA on request.
Request a capability brief- 01Die outline, thickness and pad map: locations, pitch and pad metallurgy
- 02Bonding diagram or pin-out, or ask us to propose one
- 03Target body size, lead count, lead pitch and exposed-pad size
- 04Total thickness target
- 05Die supply: diced on tape, in waffle packs, or wafers (give the wafer size)
- 06Construction: encapsulated, air cavity with a lid, or overmolded
- 07Marking content
- 08Thermal: package power, Tj max and ambient
- 09Test: your ATE, or the electrical test you need from us
- 10Quantities and dates: first-lot quantity, follow-on volume, target dates
- 11Field-life or qualification target, if you have one
- 12Already in production? The package drawing and the lot volume
Proof
From real panel-level and wire-bond builds.
Names withheld. The numbers are real.
MEMS assemblies built panel-level at 100% yield.
Aviation interposers, 50 per panel, at 100% yield.
Die placement at 3σ.
Typical pull strength against the MIL-STD-883 Method 2011 minimum.
Build detail: wire bond. Full data under NDA.
Questions engineers ask
Custom QFN, answered.
Who in the US can package a few thousand die into a custom QFN, including substrate design and laser marking?
Heisler Semiconductor. We design the package substrate for your die, have it built in panel format, then die attach, wire bond, seal, laser mark and saw the units on US soil, with inspection at each step. For a package that already works, our automated die bond and wire bond lines have open capacity now for production lots.
Do you simulate the package before building it?
Yes. Every program gets a digital twin, a full 3D model of your assembled part, plus electrical simulation against your limits and thermal simulation of the heat path. You review all three before anything goes to fab. We design the substrate from your pin-out or one we propose, and it is checked by automated design-rule checking against the fabricator's own rule deck. It is fabricated in panel format by a vendor we select for each job.
Is this a leadframe QFN or a laminate QFN?
Laminate. Your QFN is built on a substrate designed for your die, so body size, lead count, pitch and exposed pad come from your pin-out instead of a stock leadframe. A stock leadframe can be faster when one already fits your die. A custom substrate is the answer when none does.
What does one-shot development mean? Is first-pass success guaranteed?
No, it is not guaranteed. It is how most programs run. Most of the development is done before the first build. The package is checked as a digital twin (a full 3D model of your assembled part), simulated electrically and thermally, and checked against the fabricator's own rule deck. The assembly process is worked out alongside the design. The first build starts close to its final settings, every step is imaged and measured, and the details are tuned during the build. The usual result is fewer iterations, lower development cost and less time to production. Some programs are harder and need more than one build. When that is likely, the plan says so.
How is the QFN sealed? Can I get an air-cavity or overmolded QFN?
Three ways. Encapsulated units are sealed at panel level, then laser marked and sawn to size. Air-cavity QFNs use an open-cavity body with a lid, for MEMS, sensors and RF die that can't be encapsulated. Overmolded QFNs are offered as part of the same program through a local molding partner.
What testing is included?
Every lot gets incoming inspection, AQL-sampled visual inspection after die attach, wire bond and saw, die shear and wire pull samples, and outgoing inspection. X-ray is added where the program needs it. Electrical test is defined per program, on your ATE or with test we set up with you.
How long does a custom QFN program take?
Schedule is quoted per program. It is set mainly by substrate fabrication and the construction you choose. Simulation and process set-up run while material is on order, so they don't add to the schedule. Repeat lots run faster once substrates are in stock. Expedite is available.
What do I send to get a quote, and how is it priced?
Send the die outline and pad map, a bonding diagram or pin-out, the target body size and pitch, the construction, how the die will arrive, your test plan, and the quantity and dates. For a package already in production, send the drawing and the lot volume. Engineering is priced separately from the unit price. Set-up is done once, design is priced per die type, and the build is priced per lot. We send a budgetary price first and firm it once the full data package is in.
Start a QFN program
Send the pad map. Get a QFN plan back.
Substrate design, panel build, die attach, wire bond, sealing, laser mark and inspection, from first build to production lots. Request a capability brief, or send your data package under NDA.
/ Substrate design / Encapsulated, air cavity, overmolded / Production capacity open / NDA on request